Project Details

Scope of work included concrete Installations and Parking Lot Repairs across 4 different locations.

 

  • Drainage Improvements
  • Sidewalk Paving
  • Concrete Security Bollards
  • Landscaped Large Area
  • Installed Fence and Security Gates
  • Retaining Wall
  • New Staircases
  • Heavy Duty Paving
  • Curb Paving
  • Drainage Improvements
  • Concrete Curb
  • Parking Lot Striping

Highview Elementary School: Remove and repaved sidewalks. Asphalt sidewalks at the sides of the school and the installation of new sidewalks.

Nanuet Senior High School: PCC poured a new concrete planter, new sidewalk and installed new concrete bollards. We expanded the parking lot, sealed and paved as well as installed a new sidewalk along it. We removed and repaved new asphalt walkway. Installed 8 ft fence.

Barr Middle School: PCC formed and poured a new staircase as well as a new retaining wall w/ a concrete sidewalk. We removed and repaved the asphalt walkways and resurfaced the baseball court with drainage improvements.

Miller Elementary School: PCC made drainage improvements, a new bus line. Concrete sidewalk improvements and an expansion of the parking lot. Lastly removed and repaired the playground area.

Project Type

Location

Start

Completed

Share this project with your friends

Facebook
Twitter
LinkedIn

Related Projects

Eastchester DPW

Scope of work included framing and pouring a state-of-the-art garage for the DPW of Eastchester.