- Clearing and grubbing
- Concrete pavement removal
- Curb and asphalt demolition
- Excavation
- Installation of concrete sidewalks and driveways
- Safety surfaces
- Site furnishing
- Play equipment
- Electrical utilities
- Hot mix asphalt
Paladino Concrete Creations developed and implemented a plan to install a brand-new playground as part of the Yonkers Greenway in Yonkers, N.Y., a planned 2.4-mile walking and biking trail that will connect Van Cortlandt Park in the Bronx to the Yonkers waterfront upon completion.
Located in the Smith, O’Hara, Levine Park, the playground and site furnishings installed by Paladino Concrete Creations included: clearing and grubbing, concrete pavement removal, curb demolition, asphalt demolition, excavation, concrete sidewalks and driveways, safety surface installation, site furnishing, play equipment installation, electrical utilities, and hot mix asphalt. The work is widely considered part of a grander restoration effort for the park, which fell into disrepair in the 1980s and has been renovated as part of the Yonkers Greenway project.