Project Details

Scope of work included Streetscape improvements, pedestrian lighting.
  • Sawcut asphalt pavement
  • Removal of existing asphalt pavement and concrete sidewalk
  • Curb removal
  • Installation of concrete sidewalk and driveway, asphalt pavement
  • Stamped concrete
  • Installation of granite and concrete curbing
  • Concrete light pole base
  • Pedestrian light

Paladino Concrete Creations developed and executed a plan for renovating the walkways near the Paramount Hudson Valley Theater in Peekskill, N.Y. The work included sawcut asphalt pavement installation, asphalt pavement removal, concrete sidewalk and curb removal, concrete driveway installation, stamped concrete and asphalt pavement installation, granite curb installation, concrete curb and light pole base installation, and pedestrian light installation.

During this project, Paladino Concrete Creations had to safely perform concrete, asphalt, and light pole installation at the location of a popular commercial and entertainment attraction among both residents and out-of-towners. Paladino Concrete Creations spent four months making alterations to an area with significant foot and vehicular traffic, and particularly on show days, but at no point did this challenge stop Paladino Concrete Creations from prioritizing safety, deadlines, and budget. Paladino Concrete Creations finished the project within all constraints.

Project Type

Location

Start

Completed

Share this project with your friends

Facebook
Twitter
LinkedIn

Related Projects

Nanuet High School Phase 2

Scope of work included concrete Installations and Parking Lot Repairs across 4 different locations.   Drainage Improvements Sidewalk Paving Concrete Security Bollards

Eastchester DPW

Scope of work included framing and pouring a state-of-the-art garage for the DPW of Eastchester.